FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. ALL SIDEWALKS IN C4-4 THROUGH C4-7, C5 & C6 COMMERCIAL DISTRICTS, AS DEFINED IN THE NYC ZONING RESOLUTION SHALL BE OF PIGMENTED CONCRETE WITH SAW-CUT JOINTS AS SET FORTH IN SEC. The hold is to review the proposed work and set conditions for the work and/or the street restoration. PERMITTEE MUST CONTACT DOT TRAFFIC & PLANNING OFFICE BY EMAIL AT. These holds can only be released by HIQA: Cobblestone (COB) hold All permits issued to work on a cobblestone street are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. Building Operations/Construction Activity Permits apply to construction activities that take place within the street and are generally associated with construction work adjacent to the street. Office hours: 8:30 AM-3:30 PM. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. See, Utilize recycled content in paving materials. Some of the construction-related activities covered under this category include placement of materials, equipment and temporary structures on the street or sidewalk (e.g., building materials, cranes, boom trucks, a shanty or trailer, construction container, security structure, tool cart, or construction parking regulation signs) or movement of construction equipment across roadways and sidewalks. MAY ALSO WORK SAT AND SUN 7 AM TO 6 PM, AS WELL AS NIGHTLY 10 PM TO 5 AM. Emergency utility access cover openings and emergency street openings/excavations, Permittee telephone number in case of complaints, Contractor's telephone number, if different from the permittee, The permit number under which the work is being performed, The purpose of the street opening/excavation, The start and scheduled completion dates of the work. PERMITTEE MAY OCCUPY CURB LANE 24/7 FROM 10/4 THROUGH OCTOBER 10/15/2010. The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. The guidance presented in the Street Works Manual does not supersede any existing federal, state or city laws, rules and regulations. Questions regarding permit registration can be directed to the central Permit Office. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. Third, following installation of the canopy, a final inspection by HIQA is required to confirm compliance with the applicant's submitted plans. DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America.